GO toll rates 2022
Total rates 2022 including external costs
Toll for vehicles over 3.5 t MPW
valid from 1.1.2022
incl. surcharges for air and noise pollution (external costs)
|
|
| ||||
Category 2 2 axles | Category 3 3 axles | Category 4+ 4 and more axles | ||||
Day | Night | Day | Night | Day | Night | |
E/H2 | 0,05010 | 0,05050 | 0,07077 | 0,07169 | 0,10577 | 0,10693 |
EURO VI | 0,20310 | 0,20350 | 0,28497 | 0,28589 | 0,42332 | 0,42448 |
EURO V and EEV | 0,21250 | 0,21290 | 0,29813 | 0,29905 | 0,43966 | 0,44082 |
EURO IV | 0,21940 | 0,21980 | 0,30779 | 0,30871 | 0,45070 | 0,45186 |
EURO 0 to III | 0,24000 | 0,24040 | 0,33663 | 0,33755 | 0,48366 | 0,48482 |
Notes on the table:
- Rates in Euro per kilometer, excl. 20 % VAT
- Drive type E/H2 includes pure electric drive and hydrogen fuel cell drive.
- The “night” rate is defined by the time period between 10 pm and 5 am.
Section toll segments
Separate rates apply on section toll segments
These are our section toll segments:
- A 9 Gleinalm-/Bosrucktunnel (Pyhrn motorway)
- A 10 Tauern- and Katschbergtunnel (Tauern motorway)
- A 11 Karawankentunnel (Karawanken motorway)
- A 13 Brennerpass (Brenner motorway)
- S 16 Arlberg Straßentunnel (Arlberg expressway)
A 12 Inntal motorway
For the A 12, an increased rate (+25 % on the basic kilometre rate) applies on the Unterinntal section (state border at Kufstein to the Innsbruck-Amras junction).